Project: MattJ   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Matt Jakus   -  
Project:   The Airplane Factory - Sling TSi   -   VIEW REPORTS
Total Hours:1190.7
Start/Last Date:Dec 01, 2019 - Jan 29, 2023
Engine:Rotax 915is
Panel:Garmin 3X
 
Friendly URL: https://eaabuilderslog.org?s=MattJ

Home or Last Project Picture

Jan 30, 2021     Seat Belts - (8 hours)       Category: Fuselage
Installed the 3 point front seat belts. The center latching will not be installed until the rear portion of the center console is complete.

The shoulder attachment point needed both sides to be reamed with a Dremel tool for the bolt to fit. I found the bolt to put too much pressure on the composite so I made a spacer to prevent seating pressure on the composite..

The inertial reel had to have the belt removed so as to feed the belt through the side longerons. The trick is to make sure the inertial reel doesn't spin back to the retract position.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.